IMAGO Nature: Unsere Erde, Energiequellen, Wasserkraft IRKUTSK REGION, RUSSIA - JANUARY 12, 2022: A view of the dam of the Bratsk Hydroelectric Power Station in the city of Bratsk, 460km north of Irkutsk. The Bratsk Hydroelectric Power Station is the third largest hydropower plant in Russia, with a power capacity of 4.5GW; it makes part of IrkutskEnergo, a subsidiary of EuroSibEnergo. The concrete dam measures 124.5x924 meters; a section of the Baikal-Amur railway mainline and a motorway run along the ridge of the dam. Alexander Ryumin TASS TS11F723

IMAGO Nature: Unsere Erde, Energiequellen, Wasserkraft IRKUTSK REGION, RUSSIA - JANUARY 12, 2022: A view of the dam of the Bratsk Hydroelectric Power Station in the city of Bratsk, 460km north of Irkutsk. The Bratsk Hydroelectric Power Station is the third largest hydropower plant in Russia, with a power capacity of 4.5GW; it makes part of IrkutskEnergo, a subsidiary of EuroSibEnergo. The concrete dam measures 124.5x924 meters; a section of the Baikal-Amur railway mainline and a motorway run along the ridge of the dam. Alexander Ryumin TASS TS11F723

Choose your license

Rights Managed:

One-time editorial use in an online article, social media channels, internal presentation, website, newsletter, or blog.

One-time editorial use in a book, newspaper or magazine (excluding cover page), external presentation. Limited to 5,000 circulation. This includes the rights available in the Standard license.

Media Info

Credit: ITAR-TASS

Media ID:

Recording Date: Jan 12, 2022

Media Size: 5,214×3,476 Pixels

IMAGO Nature: Unsere Erde, Energiequellen, Wasserkraft IRKUTSK REGION, RUSSIA - JANUARY 12, 2022: A view of the dam of the Bratsk Hydroelectric Power Station in the city of Bratsk, 460km north of Irkutsk. The Bratsk Hydroelectric Power Station is the third largest hydropower plant in Russia, with a power capacity of 4.5GW; it makes part of IrkutskEnergo, a subsidiary of EuroSibEnergo. The concrete dam measures 124.5x924 meters; a section of the Baikal-Amur railway mainline and a motorway run along the ridge of the dam. Alexander Ryumin TASS TS11F723

Restrictions: This image can not be published in Russian Federation and Switzerland.

Release Info: Do I need a release?

Captions may have been translated or enriched by an AI system.
For more information about AI-assisted captions, see AI-assisted captions.

Need a custom license?

If your intended use isn't covered by the available options (such as non-editorial purposes or specific distribution needs), contact us. Our team will be happy to provide a tailored offer based on your requirements.