{"section":{"heading":"Related Images and Videos (10)","tiles":[{"href":"/en/st/0865409842","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5622 20260831MDL5622","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409842/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409855","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5625 20260831MDL5625","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409855/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409867","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5626 20260831MDL5626","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409867/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409885","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5794 20260831MDL5794","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409885/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409902","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5795 20260831MDL5795","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409902/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409918","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5796 20260831MDL5796","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409918/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865409929","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES 08 31 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station (NIMES GARD), France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5798 20260831MDL5798","thumbnailUrl":"https://www.imago-images.com/bild/st/0865409929/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865410109","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES August 31, 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train running between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station, NÎMES GARD, France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5799 20260831MDL5799","thumbnailUrl":"https://www.imago-images.com/bild/st/0865410109/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865410115","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES August 31, 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train running between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station, NÎMES GARD, France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5801 20260831MDL5801","thumbnailUrl":"https://www.imago-images.com/bild/st/0865410115/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]},{"href":"/en/st/0865410119","title":"PHOTOPQR LE MIDI LIBRE MiKAEL ANISSET NIMES August 31, 2026 INAUGURATION OF FRANCE S FIRST BATTERY-POWERED ELECTRIC TRAIN AT THE NIMES SNCF STATION ALSTOM Inauguration, this Monday, August 31, at Nîmes Center Station, of France’s first battery-powered train running between Nîmes and Vauvert. The trial is scheduled to last two years. This project, which saves 20% in energy, is the result of a partnership between SNCF Voyageurs, Alstom, and the Occitanie Region. This collaboration is part of a national program involving five regions in total, with a total investment of 41 million euros. Nîmes, Aug. 31: Inauguration of France’s first battery-electric train at Nîmes railway station, NÎMES GARD, France  Copyright: xPHOTOPQR LExMIDIxLIBRE MAXPPPxMiKAELxANISSETx 20260831MDL5804 20260831MDL5804","thumbnailUrl":"https://www.imago-images.com/bild/st/0865410119/s.jpg","credit":"IMAGO / MAXPPP","licences":[{"key":"1","name":"Standard","figure":"$29"},{"key":"2","name":"Extended","figure":"$99"}]}]}}